Location of performance / Site: | Miltenberg, Bavaria, Germany, Europe |
---|---|
Period: | 1992 - 1994 |
Preliminary design, detailed design, construction design, elaboration of tender documents, assistance with the award of contract, construction supelvision and construction management for the rehabilitation of the leachate collection system, manholes and ground water drainage system for the sewage sludge landfill "Schippach"