Location of performance / Site: | Kemna, Wuppertal, North Rhine-Westphalia, Germany, Europe |
---|---|
Period: | Jan 2009 - Jul 2011 |
• Preliminary and design for construction approval (capping system and adaptation of degasification system)
• Construction design and preparation of tender documents
• Assistance with award of contract procedures
• Construction supervision
• Contract management incl. cost and claims management
• Preparation of quality assurance program and health and safety
• Slope stability- and ground failure calculations
• Monitoring of drilling works
Surface sealing: | Mineral sealing |
---|