Location of performance / Site: | Freiburg im Breisgau, Baden-Wuerttemberg, Germany, Europe |
---|---|
Period: | Jul 2009 - Apr 2012 |
Quality assurance and geotechnical external supervision during construction of the mineral sealing layers and the bituminous sealing layer, incl. plane, LFG drainage and support layer, mineral base layer, mineral sealing layer (TREAmin® = quality tested mixture from waste incineration ashes and clay), asphaltic sealing, drainage layer
Surface sealing area: | 59000 m² |
---|